The reactive power consumed by the transformer is generally about 10% to 15% of its rated capacity, and its no-load reactive power is about 1/3 of the full load. Therefore, in order to improve power factor (PF) of the power system, the transformer should not operate at no-load or in a long-term low-load operation state. Vigorously improving the power factor of transformers, reducing line losses, a...
Project Name Daqing Electric Power Group Distribution Network Energy Conservation Comprehensive Management Project Project Background and Construction Objectives The distribution network of Daqing Power Group consists of 7 distribution stations, including Ranghulu, Longnan, Saltu, Dongfeng, Donghu, Honggang, and Chuangye. There are over 1000 transformers, with transformer capacities ...
Low voltage automatic contactor switched capacitor banks or filter banks typically use a delay time of 30 – 40 seconds between steps. This delay time is chosen to ensure that the capacitors have discharged prior to being re-connected. The long delay time limits the autobank’s ability to track rapidly changing loads. The slow response time may result in an overload condition in filter b...
Hybrid power factor correction Hybrid Active power factor correction systems utilise power electronics and digital control to achieve active reactive current compensation for specific and high performance solutions. YTPQC hybrid power factor correction system is comprised from both capacitor based and Static Var Generator(SVG,Active Power Factor correction). Static Var Generator is use...
YTPQC-AHF Active Harmonic Filter can realize 2nd to 50th harmonic compensation with full compensation or seletive compensaton, output compensation current follows the system harmonic variation, devoted to green power quality. Our AHF's compensation capacity(ratio) can be set freely by the customers, to realize harmonics compensation, reactive power compensation or imbalance compensation. YT...
We YT are the biggest manufacture of low voltage Static Var Generator and Active Harmonic Filter, all our factory take the quality as the most important positon. YT Incoming material Quality Control IQC check the raw materials, electronic components and enclosures from our suppliers before admitting to our warehouse. YT Process Quality Control In Process Quality Control, ...
The 31st Shanghai International Power Equipment and Technology Exhibition Recently, the focus of attention in the power industry has gathered at a highly anticipated event - the 2023EP Power Exhibition. The exhibition brings together leading enterprises, experts, and technology innovators in the industry, aiming to share the latest power system solutions, showcase advanced equipment and tec...
The correct compensation capacity is very important for projects, where need to install reactive power compensation device, such as capacitor banks, or Static Var Generator SVG, or Hybrid reactive power compensation device. For new projects: New Projects which are at the design stage: The required compensation capacity (kVAr) can be calculated using Power Factor Calculatation tools. Our YT'...