For all clients, We adhere to quality-oriented, try our best to meet customer's technical requirement. Our client also has a good,professional technical team, they buy our modules to build cabinet locally in Australia. Since we worked with Australian clients, they have build Static Var Generator(SVG) panel, Active Harmonic Filter(AHF) panel, and hybrid SVG and AHF panel. This customer's visit gave...
Backgaround With the development of the economy and the improvement of green energy awareness, more and more regions are using clean energy and installing a large number of solar power generation equipment. With the widespread use of photovoltaic power generation, many users have found that there are power adjustment fees, namely power fines, in the electricity bill, and the amount of fines is rel...
YTPQC-AHF Active Power Filter has been operating safely and stably in France YTPQC-AHF Active Power Harmonic Filter is an advanced power quality control equipment, which can compensate reactive power ,harmonics current and imbalance by setting parameters from friendly Human Machine Interface.This time French client purchased our Active Harmonic Filters mainly to improve Power Factor and mitigate h...
Power factor is a measurement of electrical system efficiency. Many utilities have a power factor penalty built into their rate structure to penalize users with a low power factor reading in their electrical system. To improve the power factor, the most common solution is to install a capacitor banks, But Static Var Generator is the best power factor correction product. There are 3 kinds of...
SVG (Static Var Generator) and conventional capacitor bank are both devices used in power systems for reactive power compensation, but they have significant differences in terms of operation, performance, and flexibility. Here's a comparison between SVG and conventional capacitor bank: 1. Operation: - SVG: SVG uses power electronics-based technology to dynamically control and r...
The reactive power consumed by the transformer is generally about 10% to 15% of its rated capacity, and its no-load reactive power is about 1/3 of the full load. Therefore, in order to improve power factor (PF) of the power system, the transformer should not operate at no-load or in a long-term low-load operation state. Vigorously improving the power factor of transformers, reducing line losses, a...
Project Name Daqing Electric Power Group Distribution Network Energy Conservation Comprehensive Management Project Project Background and Construction Objectives The distribution network of Daqing Power Group consists of 7 distribution stations, including Ranghulu, Longnan, Saltu, Dongfeng, Donghu, Honggang, and Chuangye. There are over 1000 transformers, with transformer capacities ...
Low voltage automatic contactor switched capacitor banks or filter banks typically use a delay time of 30 – 40 seconds between steps. This delay time is chosen to ensure that the capacitors have discharged prior to being re-connected. The long delay time limits the autobank’s ability to track rapidly changing loads. The slow response time may result in an overload condition in filter b...